Instruction andMaintenance ManualERICO®RAIL GRINDERModel SBG200
5www.erico.comENGINE MAINTENANCE SCHEDULEREGULAR SERVICE PERIOD (3)ITEMPerform at every indicated month or operating hour interval, whichever comes fi
6www.erico.comTROUBLE SHOOTING CHARTPages referenced in the maintenance schedule and trouble shooting chart are in the Honda engine owner’s manual GX2
7www.erico.comGRINDING WHEELDANGEREXPLOSIVE DISINTEGRATION HAZARD: Worn or damaged grinding wheels can explosively disintegrate when turning at highs
8www.erico.comSBG200 RAIL GRINDER PART LISTItem ERICO®Part No. Quantity DescriptionSBG200 Rail grinder assembly1 SBG20001 2 Bearing housing2 SBG20002
9www.erico.comSBG200 RAIL GRINDER EXPLODED VIEWNOTES:1. Apply LOCTITE®to fasteners prior to tightening. See torque chart for required torque levels.2.
10www.erico.comCup Grinding Wheel Part No. SBG20015 Plug Grinding Wheel Part No. SBG20018Grinding Wheel Guard for above Part No. SBG20015G (not pictur
11www.erico.comERICO®RAIL PRODUCTS LIMITED WARRANTYSBG200 Series Rail GrinderERICO Inc. will repair or replace, at its option, any part that is proven
iwww.erico.comWARNING:1. ERICO products shall be installed and used only as indicated in ERICO product instruction sheets and training materials. Inst
iiwww.erico.comGENERAL SAFETY INFORMATIONRead, understand, and follow all safety instructions before operating or performing maintenance on the equipm
iiiwww.erico.comGENERAL SAFETY INFORMATIONPOTENTIAL PHYSICAL HEALTH PROBLEMPROTECTION FROM VIBRATION: Vibrations from hand-held tools of this type ma
ivwww.erico.comFUELDANGERDO NOT SMOKE or bring any flame or sparks near fuel. Failure to observe this precaution can be fatal or result in serious inj
1www.erico.comSPECIFICATIONSENGINE: ERICO®Part No. SBG20023Type: Single Cylinder, 4-Stroke Engine Power Head: Honda®GX25/ 1.1Hp Displacement: 25cc
2www.erico.comGRINDER PART IDENTIFICATIONBEARINGHOUSINGCARRYHANDLEENGINECHOKEON/OFFSWITCHTHROTTLETRIGGERENGINE STARTERPULL CORDENGINE OIL FILLER CAP (
3www.erico.comINSTRUCTIONS FOR STARTING“COLD STARTING” PROCEDURES: The Choke must be in the “CLOSED” position, and the On/Off switch must be in the “
4www.erico.comRAIL GRINDING PROCEDUREBefore grinding, wipe the rail surface clean with a cloth saturated with mineral spirits, followed by a wipe with
Comments to this Manuals